The top will get chopped.
The first order of business is to get the 2-Door doors installed and aligned.
The starting point:





The posts are not welded on the bottom because the rockers were replaced.
The tops of the B-Pillars will need to be cut out and moved back to accommodate
the new longer doors.
The hinges need some work: